Autosorb iQ - Outgassing (monitor) - Status: In Use

Fully automated high-resolution gas sorption analyzer possessing three sample ports (analysis station) and four sample preparation ports (outgassing station). Includes a turbo-molecular drag pump and low-pressure transducers (10 and 1 Torr) for measurement of adsorption behavior at pressures required for low surface area measurements (requires krypton) and to observe the filling of micropores.

One port is available as a chemisorption station, complete with a high-temperature (1100⁰C) furnace coupled with fan-assisted cooling, and a digital temperature controller for precise chemisorption measurements. Includes automated gas switching, in-situ and/or separated sample preparation.

A vapor dosing option is available for both physi - and chemi- sorption analysis and features a 50°C thermostatted manifold chamber. Typical vapors include water, alcohols, and aromatics which can impact material characteristics, shelf life, performance, and stability.

Also, our Autosorb iQ is integrated with a thermal conductivity detector (TCD) & cold trap option and includes electronic loop injection. TCD enables to perform temperature programmed methods TPR (temperature-programed reaction)/ TPD (temperature-programed desorption)/ TPO (temperature-programed oxidation) and pulse chemisorption analyses for use with a wide-range of gases. The included, automatic loop injector allows for easy pulse titration analyses as well as peak calibration activities. Users can view the current tool screen (available on campus or via VPN only): http://sf01.rsc.aux.eng.ufl.edu/0.mp4Latest Status Log EntryJan 11, 2024 - Resource Status Up - Up from break, leak tested and SRM ran on station 2 within spec.

Use Prerequisites

PrerequisiteDescriptionStatus
Computer AccessRequires computer access be setupCheck Your Status
Funding SourceRequires permission to an active funding sourceCheck Your Status
Work PlanRequires a work plan be approved by PI and staffCheck Your Status
Agreement FormRequires completed agreement form for equipment usageCheck Your Status
RSC Safety TrainingRequires completion of safety trainingCheck Your Status
NRF Building AccessRequires issue of an id badge and entry badge and/or access level to be set.Check Your Status
Equipment TrainingRequires completion of equipment trainingCheck Your Status

An active Gatorlink login is required to create a new reservation.