E-beam evaporator, PVD - Status: Available
|
4 pocket 15cc e-beam,
one 3" DC sputter source,
substrate heater Reservations are required and must be made 24 hrs in advance. E-Beam evaporator Wiki Link Microfabrication wiki link Latest Status Log EntryApr 25, 2024 - User Note: Targets: Ag, Au, Pd, Ti. |
An active Gatorlink login is required to create a new reservation.